Abandonment:

Methods:
- Poly-coiled tubing
- Steel tubing, tremmie line
- Pressure from surface (bull head) grouting
- Squeeze projects (Braden, perforation)
Depth capabilities:
- 2500’+ with 2” poly tubing
- 7000’+ with steel tubing or tremmie line
Industries served:
- Water wells
- Gas & Oil
- Mining
RACS believes in providing efficient abandonment solutions for our clients as we provide all equipment and services necessary to complete the project. Our company can mix and pump a variety of abandonment products that include cement, bentonite, and varying mixtures of each.
